Flags · one of 98
Walkover date required ▲
Small sites metric 1.2.3 · ▲ input error · raised at 3. Desktop Assessment!D20
Raised when
Desktop Assessment: the site walkover date is blank.
To clear it
Enter the walkover date. The tool prints the date the survey stays valid (six months).
See every flag your metric raised, on one page. Drop the workbook on the Check page and Quadrat gathers each ▲ and ⚠ it wrote, with these notes beside it, plus what a planning officer will ask that the metric never flags.
This is one of 98 flag strings the GOV.UK statutory biodiversity metric 1.0.4 and small sites metric 1.2.3 write into cells. Explained from the workbooks' own formulas; where the statutory metric user guide's troubleshooting table covers a flag, the page says so. Quadrat is not affiliated with Defra, Natural England or any planning authority.